Approved from sharjah police authority

List of Projects

1. Pullman Resort Al Marjan Island | 5 Star Resort in Ras Al Khaimah

  • Cable pulling for 630CAT 6 Cable along withEnd-to-End termination and Rack Dressing.
  • Fix 630 indoor and outdoor Aps devices.

2. Rotana Ras Al Khaimah - The Mangroves.

  • Fix750 Aps.
  • Fix 650 IP Phones

3. DU-Tarkeeb ISP work.

Perfect Solution has extensive hands-on experience in the design, installation, testing, and commissioning of fiber optic networks for ISP, Shortfall, and Vertical cabling projects. Our scope of work includes, but is not limited to:

  • Fiber optic cable pulling in Vertical Bldg and Horizontal as per DU standards
  • ODF installation, fiber splicing, and termination
  • Testing using OTDR and Power Meter with proper reports
  • Installation of FTTX / ISP infrastructure.
  • Vertical cabling and Installation of Wall Mount as per DU standard. 
  • Civil and containment works (GI, PVC, HDPE ducts)
  • GAID labeling, Patch cord labeling also dressing of FTB Box and Power meter reading as per DU slandered. 
  • Labeling, documentation, and as-built drawings as per DU requirements

Our technical team is well-trained and familiar with DU-approved materials, methodologies, safety regulations, and quality procedures, ensuring all works are completed to the highest industry standards and within project timelines.

Under progress Projects.

1. RAK Hospitality Phase 2.

We have 9 buildings in Project. All have typical floors. Per floor 32 rooms and 142 DATA And TV points. Each floor have 12 CCTV points. All CAT 6A cabling and end to end termination also Rack Dressing.

2. Saij mountain lodge ras al Khaimah

  • 193 cctv cameras installation and focusing.
  • 451 DATA points end to end termination
  • 759 Fiber Splicing